R.Eldridge
03-14-2007, 07:50 AM
Hello,
There are several process lines that will not hold any of the Process data; ie. Insulation Specs, pnum specs and so on. As a result when we try to enter an insulation symbol, no specs are added.
Let me give you a little history on the lines that we are having trouble with. In the beginning of this project, we had initially set the project up as Mixed Metric. About a third through the P&IDs we switched to Imperial. It seems that all the process lines which were built pre the Imperial switch will not retain the Process data.
We have dumb text the data into the lines and the insulation symbols for the time being.
Thanks for your help!!
Rebecca Eldridge
Process CAD Operator
There are several process lines that will not hold any of the Process data; ie. Insulation Specs, pnum specs and so on. As a result when we try to enter an insulation symbol, no specs are added.
Let me give you a little history on the lines that we are having trouble with. In the beginning of this project, we had initially set the project up as Mixed Metric. About a third through the P&IDs we switched to Imperial. It seems that all the process lines which were built pre the Imperial switch will not retain the Process data.
We have dumb text the data into the lines and the insulation symbols for the time being.
Thanks for your help!!
Rebecca Eldridge
Process CAD Operator